At Midori, every detail reflects our commitment to quality, comfort, and longevity. From robust structural frameworks to exquisite finishes, our apartvillas are crafted using the finest materials and modern construction techniques. Exteriors are designed for durability and aesthetic elegance. Every specification has been selected to ensure not just luxury, but a home that grows with your family - timeless, resilient, and unmistakably refined.
.jpg)
| Total Units | 116 |
| Floors | G+3 |
| Total Acres | 5.42 Acres |
| Legal Approval | RERA |
| Zone designed | Seismic Zone-II Compliant |
| Structure | R CC Framed Structure with Floor heights of 10'-6" |
| Main walls & partition walls | Burnt Brick masonry - 9" & 4.5" using burnt clay bricks |
| External Plastering | Double coated Sand faced plaster with water- proofing compound |
| Internal Plastering | Smooth finish Cement Plaste |
| Internal Painting | Emulsion paint - Premium |
| External Façade & Painting | Combination of weather proof paint & textured finish as per design intent |
| Staircase railing | MS Railing of 1.20 m Ht |
| Entrance Foyer, Living & Dining | I-Marble flooring/ Vitrified Flooring |
| Master Bedroom | I-Marble flooring/ Vitrified Flooring |
| Other Bedroom | I-Marble flooring/ Vitrified Flooring |
| Kitchen | Antiskid Vitrified Flooring |
| Utility | Antiskid Vitrified Flooring |
| Toilet | Antiskid Vitrified flooring & Glazed for wall (upto false ceiling) |
| Balcony | Antiskid Vitrified Flooring |
| Corridor | Granite/ Antiskid Vitrified flooring with skirting |
| Staircase | Kota Stone |
| Lift Cladding | Cladding as per design intent |
| Lift | Fully automatic - 6 - 8 passengers lift for every block |
| Maindoor | Ghana Teakwood frame with 40 mm Flush door shutter with BST veneer and melamine polish finish |
| Bedroom Doors | Red meranti or redsal wood frame with 35mm Flush door shutter with BST veneer and melamine polish finish |
| Bathroom Doors | Red meranti or redsal wood frame with 35mm Flush door shutter with OST veneer and melamine polish finish |
| Balcony door | 3 track glazed UPVC sliding door with mosquito mesh |
| Balcony railing glass | As per design intent |
| Windows | 2.5 track glazed UPVC sliding door with mosquito mesh |
| Ventilator | Louvered ventilator with exhaust fan provision |
| Door hardware | Main door: Smart digital locking system of reputed brand |
| CP and Sanitary fixtures for Toilet | Jaquar or Equivalent |
| Sinks in Kitchen and Utility | Single Bowl in kitchen and Double Bowl in utility of reputed make |
| Plumbing (Internal and External) | All Water Supply Lines in CPVC Pipes and Waste Water Lines in DWC/SWR Pipes |
| False ceiling for all toilets | As per design intent |
| Lift | Fully automatic - 6 - 8 passengers lift for every block |
| Water Supply System | Hydropneumatic System |
| Wiring | Fire Resistant Electrical Wires of reputed brand. Polycab/ Equivalent |
| Earthing | Earth Leakage Circuit Breaker (ELCB) & Miniature Circuit Breakers (MCB) |
| Switches | Legrand or equivalent. |
| Connected Power Load | 5 KW for flats lesser than 2000 sft, 7 KW for flats bigger than 2000 sft |
| TV Points | Living, Dining and all Bedrooms |
| Geysers | Provision will be provided in the toilets |
| A/C Provision | Split A/ C power points in Living, Dining and all Bedrooms. |
| Chimney | Provision will be provided |
| Washing machine | Provision will be provided in the utility area |
| Wi-Fi connectivity | Provision for Living, Dining & All Bedrooms |
| Backup Power | 100 % power back-up for all common areas and services. 1 KVA for each apartment (for lighting use only) |